In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
demonstrated the ability to | ||
1 | select and wear appropriate personal protective equipment for post and wire fence construction | Summary sheet |
2 | name at least four tools used in post and wire fencing | Summary sheet |
experienced | ||
3 | clearing a fence line from obstacles eg previous posts | Summary sheet |
4 | digging at least two holes for straining and turning posts using spades and shuv-holers | Summary sheet |
5 | using a mallet and chisel to secure strut ends to the posts | Summary sheet |
6 | using a post driver to knock in the intermediate stakes | Summary sheet |
7 | hammering staples correctly into the posts to secure the wire | Summary sheet |
8 | adjusting the tension of the wire using monkey strainers | Summary sheet |
9 | working safely in a practical environment | Summary sheet |
shown knowledge of | ||
10 | the reason why the top wire must be stapled and strained | Summary sheet |
11 | the reason why mature living trees should never be used as posts | Summary sheet |
12 | at least two different materials needed prior to construction of the post and wire fencing. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 23 March 2010Level - Entry Level