Unit Award Scheme
71478 TEXTILES: SOCK PUPPET
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
demonstrated the ability to | ||
1 | design their own sock puppet | Summary sheet |
2 | identify the materials required for the project | Summary sheet |
3 | cut different materials into smaller sections that are appropriate for the sock puppet | Summary sheet |
4 | construct and assemble the sock puppet | Summary sheet and/or student completed work |
experienced | ||
5 | taking part in small group role plays with the sock puppets. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 8 April 2008Level - Pre-Entry Level