Unit Award Scheme

121664 PLASTERING (UNIT 3): FIXING PLASTERBOARD TO A TIMBER FRAME

In successfully completing this unit, the Learner will have

Evidence needed

shown knowledge of

1the key purpose for the appropriate personal protective equipment (PPE) for fixing plasterboardsSummary sheet and/or student completed work
2the names of the key tools and equipment required for fixing the plasterboardsSummary sheet and/or student completed work
3the key uses of materials required for fixing the plasterboardsSummary sheet and/or student completed work

demonstrated the ability to

4select the appropriate PPE for fixing the plasterboardsSummary sheet
5select the tools and equipment required for fixing the plasterboardsSummary sheet
6prepare and use the materials in line with the manufacturer’s instructionsSummary sheet
7apply the plasterboards to meet the specificationsSummary sheet
8complete the work with minimal defectsSummary sheet
9set up the work area safelySummary sheet
10maintain a clean and safe working area following the key health and safety guidelinesSummary sheet
11clear the work area of surplus materials and debris on completion of the workSummary sheet
12clean all the tools and equipment ready for re-use.Summary sheet

All outcomes recorded on an AQA Summary Sheet

Approved 18 July 2024Level - Level One