Unit Award Scheme

120949 PLUMBING INSTALLATIONS: BUILDING A WASTE PIPE CIRCUIT

In successfully completing this unit, the Learner will have

Evidence needed

shown knowledge of

1selecting the appropriate sized waste pipe for a jobSummary sheet
2planning a waste route with adequate fallSummary sheet

demonstrated the ability to

3measure and cut the waste pipes with accuracySummary sheet
4fit 90° elbow joins to the plastic waste pipesSummary sheet
5fit 45° joins to the plastic waste pipesSummary sheet
6fix the waste pipes to a wall using appropriate fixings.Summary sheet

All outcomes recorded on an AQA Summary Sheet

Approved 10 May 2024Level - Entry Level