120949 PLUMBING INSTALLATIONS: BUILDING A WASTE PIPE CIRCUIT
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
shown knowledge of | ||
1 | selecting the appropriate sized waste pipe for a job | Summary sheet |
2 | planning a waste route with adequate fall | Summary sheet |
demonstrated the ability to | ||
3 | measure and cut the waste pipes with accuracy | Summary sheet |
4 | fit 90° elbow joins to the plastic waste pipes | Summary sheet |
5 | fit 45° joins to the plastic waste pipes | Summary sheet |
6 | fix the waste pipes to a wall using appropriate fixings. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 10 May 2024Level - Entry Level