Unit Award Scheme
120947 PLUMBING INSTALLATIONS: BUILDING A COLD WATER CIRCUIT
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
shown knowledge of | ||
1 | what a cold water circuit is used for | Summary sheet |
2 | how to turn off a water system and drain it down | Summary sheet |
demonstrated the ability to | ||
3 | select the correct pipes for a water circuit | Summary sheet |
4 | measure and cut lengths of the pipe with accuracy | Summary sheet |
5 | fit a 90° elbow connector to join plastic pipes in a water circuit | Summary sheet |
6 | fit a push fit equal tee join to spur off a water circuit | Summary sheet |
7 | fit a push fit stop end at the end of a water circuit | Summary sheet |
8 | cut the pipes to insert a push fit isolating valve in a circuit | Summary sheet |
9 | join copper piping to plastic piping using push fit connectors. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 10 May 2024Level - Entry Level