Unit Award Scheme
120281 BRICKLAYING: BUILDING A CORNER WALL (UNIT 3)
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
shown knowledge of | ||
1 | the purpose for Personal Protective Equipment (PPE) appropriate for constructing brick walls | Student completed work |
2 | at least two names of tools and equipment required for constructing brick walls | Student completed work |
3 | at least two materials required for constructing brick walls and their uses | Student completed work |
demonstrated the ability to | ||
4 | select the PPE appropriate for constructing brick walls | Summary sheet |
5 | select the tools and equipment required for constructing brick walls | Summary sheet |
6 | prepare and use materials in line with the manufacturer’s instructions | Summary sheet |
7 | lay bricks to meet the required specifications | Summary sheet |
8 | complete the work with minimal defects | Summary sheet |
9 | set up the work area safely | Summary sheet |
10 | clear the work area of surplus materials and debris on completion of the work | Summary sheet |
11 | clean all tools and equipment ready for re-use | Summary sheet |
experienced | ||
12 | maintaining a clean and safe working area following health and safety guidelines. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 10 January 2024Level - Level One