Unit Award Scheme

118388 MAKING A BAT BOX USING A PRODUCTION PLAN

In successfully completing this unit, the Learner will have

Evidence needed

demonstrated the ability to

1follow a production plan to make a bat boxSummary sheet
2work safely in the workshopSummary sheet
3collect the wood needed for the bat boxSummary sheet
4use the marking out templates to mark the position of the pilot holesSummary sheet
5use a power drill fitted with a 2mm drill to pilot drill the holesSummary sheet
6use the pillar drill to countersink the pilot holesSummary sheet
7assemble the bat box using a screwdriver and screws following the assembly drawing.Student completed work and/or photograph(s)

All outcomes recorded on an AQA Summary Sheet

Approved 11 January 2023Level - Entry Level