115302 BRICKLAYING: BUILDING A STRAIGHT CAVITY WALL
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
demonstrated the ability to | ||
1 | measure, mark and set out the work area | Summary sheet |
2 | select the correct materials and tools to build the project | Summary sheet |
3 | identify the correct consistency of cement for laying bricks and blocks | Summary sheet |
4 | bond the bricks and blocks correctly and lay them plumb to a tolerance of +/- 5mm | Summary sheet |
5 | transfer the level to a tolerance of +/- 5mm | Summary sheet |
6 | gauge the height to a tolerance of +/- 5mm | Summary sheet |
7 | create a cavity of 100mm | Summary sheet |
8 | space the ties 400mm-600mm apart | Summary sheet |
9 | joint the bricks with minimal to finish the wall. | Student completed work and/or photograph(s) |
All outcomes recorded on an AQA Summary Sheet
Approved 30 April 2021Level - Entry Level