Unit Award Scheme
111045 INTRODUCTION TO DRY STONE WALLING
In successfully completing this unit, the Learner will have | Evidence needed | |
---|---|---|
shown knowledge of | ||
1 | the basic elements of dry stone wall construction including foundation, courses, through-stones, coping and fill/hearting | Summary sheet |
demonstrated the ability to | ||
2 | select appropriate materials for constructing a dry stone wall | Summary sheet |
3 | select appropriate personal protective equipment for constructing a dry stone wall | Summary sheet |
4 | sort the stones into separate piles according to shape and size | Summary sheet |
5 | construct two courses of one side of the wall, at least 1m long, working in a methodical manner | Summary sheet |
6 | leave the work site safe and tidy | Summary sheet |
shown knowledge of | ||
7 | at least two correct manual handling techniques | Summary sheet |
experienced | ||
8 | taking part in a discussion about the benefits to wildlife of a dry stone wall and the functions of a dry stone wall. | Summary sheet |
All outcomes recorded on an AQA Summary Sheet
Approved 12 September 2018Level - Pre-Entry Level